Lightolier Indoor Furnishings 1001F Series User Manual

READ AND UNDERSTAND THESE INSTRUCTIONS  
INSTRUCTION SHEET NO.  
BEFORE INSTALLING LUMINAIRE.  
This luminaire is intended for installation in accordance with the National Electrical Code and local regulations.  
To assure full compliance with local codes and regulations, check with your local electrical inspector before  
installation. To prevent electric shock, turn off electricity at main power supply before proceeding.  
IS:1101F  
Retain these instructions for maintenance reference.  
Page 1 of 3  
D1007  
INSTALLATION PROCEDURE FOR:  
Lytecaster® 1101F, 1001F and 2001F Series Frame-In Kits  
CAUTION: (RISK OF FIRE) THIS IS A NON-IC RATED FRAME-IN KIT.  
DO NOT INSTALL INSULATION ABOVE OR WITHIN 3 INCHES (76mm) OF ANY PART OF LUMINAIRE.  
CAUTION: USE ONLY WITH REFLECTOR TRIMS PROVIDED BY LIGHTOLIER. USE OF OTHER MANUFACTURER’S TRIMS  
MAY VOID THE UNDERWRITERS LABORATORIES LISTING AND COULD CONSTITUTE A FIRE HAZARD.  
CAUTION: BEFORE INSTALLING FRAME-IN KIT AND REFLECTOR TRIM, READ ALL MARKINGS ON FRAME-IN KIT AND  
REFLECTOR TO DETERMINE LAMP WATTAGE AND TYPE APPLICABLE FOR YOUR INSTALLATION.  
INSTALLATION INSTRUCTIONS FOR GRID CEILING APPLICATIONS  
1
PREPARATION: Cut appropriately sized hole in Ceiling Tile (by  
others) at the position desired and place Ceiling Tile in Grid (by  
others) (Figure A). Loosen Wing Nuts on Frame Clamps enough to  
allow free movement of Mounting Bars (Figure B).  
APERTURE HOLE SIZE  
1101F SERIES 6-15/16” (176mm) DIA.  
1001F SERIES  
5-1/4” (134mm) DIA.  
2001F SERIES 3-15/16” (100mm) DIA.  
2
POSITION LUMINAIRE FRAME: Place Luminaire Frame on top of Ceiling Tile and center the frame aperture on the  
Ceiling Tile hole cut in Step 1 so that the aperture wall extends into the Ceiling Tile. Orient the Luminaire Frame to  
align with the grid (Figure C). Grasp the T-Bar Clips on each end, one in each hand, lift the clips to the top of the  
adjustment slots in the End bracket, extend the End brackets to contact the Ceiling Grid, and drop each T-Bar Clip  
over the Grid (Figure D).  
NOTE: When the Luminaire Frame is to be used with Wall Wash Trims make sure to orient the Luminaire Frame side  
indicated by a label on the frame towards the wall to be illuminated.  
3
CLAMP TO GRID and LOCK LUMINAIRE FRAME: Making certain that the Luminaire Frame is still centered on the  
Ceiling Tile, tighten the T-Bar Clip Wing Nuts to attach the frame to the Ceiling Grid (Figure E). Retighten the Wing  
Nuts on the Frame Lock Clamps after the frame is positioned satisfactorily and is locked to the Ceiling Grid.  
Figure A  
Figure C  
Figure E  
Figure B  
Figure D  
Figure F  
BALLAST REPLACEMENT: Ballast replacement must be performed by a “qualified electrician”. TURN OFF  
POWER. Remove reflector trim from luminaire. Remove j-box cover to which the ballast is mounted by lifting the  
spring. For LC models remove two battery nuts. Remove ballast assembly through the ceiling hole. Disconnect all  
input wiring to the ballast. Release all wires from ballast wire connectors by inserting small blade tool, with insulated  
handle, into wire release slots (Figure F). Remove ballast from j-box door and replace with new ballast. Rewire and  
reassemble.  
*
*
REFLECTOR TRIM INSTALLATION: See separate Trim Instruction Sheet for installation procedure.  
A
COMPANY  
631 Airport Road, Fall River, MA 02720  
 
INSTRUCTION SHEET NO.  
INSTALLATION PROCEDURE FOR:  
Lytecaster® 1101F, 1001F and 2001F Series Frame-In Kits  
(Continued)  
IS:1101F  
Page 3 of 3  
D1007  
INSTALLATION INSTRUCTIONS FOR STEEL CONSTRUCTION APPLICATIONS  
1
PREPARATION: Remove Wing Nuts on T-Bar Clips and reverse clips to inside of Luminaire Frame. Loosen Wing  
Nuts on Frame Clamps enough to allow free movement of Mounting Bars. Using standard ½” EMT tubing, cut pieces  
to required length such that it spans across Hat Channel. Position EMT across Frame Mounting Bars and loosely  
secure to End Brackets with T-Bar Clips. (Figures A, B, & C)  
NOTE: The Mounting Bars may be readily adjusted to fit desired openings between 13” (330mm) minimum and 24”  
(610mm) maximum.  
2
POSITION AND INSTALL LUMINAIRE FRAME: Position Luminaire Frame at approximate location with EMT resting  
on Hat Channel. Secure EMT to Hat Channel. Adjust frame to final location by sliding along EMT & Mounting Bars.  
Lock the Frame in place by tightening the Wing Nuts on the Frame Clamps and T-Bar Clips.  
NOTE: When the Luminaire Frame is to be used with Wall Wash Trims make sure to orient the Luminaire  
Frame side indicated by a label on the frame towards the wall to be illuminated.  
Figure A  
Figure B  
Figure C  
A
COMPANY  
631 Airport Road, Fall River, MA 02720  
 

Kyocera All in One Printer KM C3130 User Manual
Lexmark Printer Z42 User Manual
LG Electronics Clothes Dryer DLE7177 User Manual
Lincoln Automobile 2011 MKT User Manual
Lowrance electronic Fish Finder X 4 PRO User Manual
Makita Portable Radio BMR100 User Manual
M Audio Stereo System 34 36 User Manual
Maxon Telecom Microphone 49 sx User Manual
Maytag Refrigerator MFD2562VEA2 User Manual
Mercury Marine Outboard Motor BIGTILLER User Manual